
Bella Vista House
- Bedrooms
- 5
- Bathrooms
- 6
- Car spaces
- 3
- Land
- 700 m²
- Floor area
- 550 m²
- Build type
- New build
- Location
- Bella Vista, NSW
Project overview
A new home at Bella Vista, photographed at handover before the owners moved in. Full-height joinery through the butler’s pantry and robes, stone to the wet areas, and oak floors run through the living level.
Photographed at handover, before a stick of furniture went in — which is the only time you see the joinery, the panelling and the stone doing the work on their own.
The build
Planned around one long sightline
Kitchen, living and terrace on a single axis, so the ground floor reads as one room with the glazing at the end of it.













On site
The finishes carry it
Marble, panelling, joinery and iron — an interior where nothing is standing in for something better later.



