Custom Home Builders · Sydney
Featured WorkWork Enquire
Featured Work What We Do Process About Learn FAQs Enquire
(02) 8850 6585 · Sydney
Brick duplex pair at Ryde, street elevation
Where we buildRyde and East Ryde

Custom home builder in Ryde and East Ryde.

Suburban lots, duplex sites and knockdown rebuilds across the City of Ryde. Three of the seven completed homes on this site are here.

The area

Land worth more than the house on it.

Ryde is mostly established housing on lots between roughly 380 and 800 square metres, close enough to the city and the river to have been worth holding. That combination is why so much of the building work here is replacement rather than expansion.

Knockdown rebuilds
The common job in this area. The block is right, the street is right, and the house on it has reached the end of being worth repairing.
Duplex and dual occupancy
Lot sizes here often support a pair rather than a single house. Whether yours does is a question about frontage, area and the controls that apply to it — worth answering before you commit to a design.
Narrow frontages
Setbacks, overshadowing and privacy to the neighbours govern more of the plan on a suburban lot than most people expect. It is usually where a catalogue plan fails.
Cross-fall
The ground around East Ryde and the river valleys moves. Fall across a block changes the slab, the retaining and where the garage can sensibly sit.
Established trees
Street trees and neighbouring canopy are a planning matter as well as an asset. Root zones affect footings and where a driveway can cross.
Construction access
On a narrow lot with no rear lane, everything comes in over the front boundary. It affects the program, the sequence and the cost of the outside work.

Built here

Completed homes in Ryde.

Pemberton House fits two dwellings and a pool onto a 385 m² site. Hampton House at East Ryde replaced the house that was on the block.

Rear lawn, pool and alfresco at Pemberton House

On a small block

The outside is the part that usually gets cut.

On a 385 square metre duplex site there is no spare ground. The pool, the alfresco, the fencing and the setback planting all have to be designed at the same time as the house, because each one takes space from the others.

Where the outside is a second contract signed later, that co-ordination does not happen and the garden becomes whatever is left over. Here it is inside the same lump sum and the same program as the house.

Pools and landscaping

Common questions

About building in Ryde.

Ryde and East Ryde

Can I build a duplex on my block?

It depends on the frontage, the area and the controls that apply to the site. It is the first thing worth checking, because the answer changes what the land is worth to you as well as what you can build. Send the address and you will get a view.

Is a knockdown rebuild worth it here?

Often, because in this area the land usually carries most of the value and the houses are old enough that repairing them stops making sense. It is still a question about your particular house rather than a rule.

How do you build on a narrow lot with no rear access?

Everything comes in over the front boundary, so the sequence matters more than it does on an open site: the parts that need machine access happen while there is still room for a machine. That is planned at the start, not improvised in month seven.

Credentials

Everything here is checkable.

Every line of the paperwork below can be verified without asking us.

Licence
NSW Builder Licence 274764C

Checkable on the NSW Fair Trading register in about a minute.

Insurance
Home Building Compensation Fund

Cover arranged through icare NSW, issued per job before work starts.

Memberships
Master Builders Association
Housing Industry Association

Both bodies publish searchable member directories.

Record
Building since 2011

More than eighty projects across Sydney. Eight of them are documented here.

Start a conversation

Send an address in Ryde or East Ryde.
We will tell you honestly what it can carry.

No obligation, no sales appointment, and no number invented before anyone has walked the block.