Custom Home Builders · Sydney
Featured WorkWork Enquire
Featured Work What We Do Process About Learn FAQs Enquire
(02) 8850 6585 · Sydney
Acreage home at Cattai from above, driveway and bushland beyond
Where we buildHawkesbury

Custom home builder in the Hawkesbury.

Cattai, Pitt Town and the rural-residential blocks along the river. Two of the seven completed homes on this site are here.

The area

Space, and four things that come with it.

Rural-residential land in the Hawkesbury gives you room that no suburban lot can. What it also gives you is a longer list of things that have to be resolved before a house can be drawn, and most of them are easier to resolve early.

Flood planning
Parts of the Hawkesbury sit inside the Hawkesbury–Nepean flood planning area. Where they do, a flood planning level can govern floor heights, materials and sometimes where on the block a house is allowed to sit at all.
Bushfire-prone land
Common on the bush fringe. A BAL assessment sets a construction level, and that level changes windows, screening, decking and eave detailing.
No sewer
Much of this land is unsewered, so an on-site wastewater system is designed and approved with the house. Its location constrains where the house and the pool can go.
Services
Power, water and communications may have a long way to travel. On a large block those runs are a real number rather than a detail.
Ground and levels
Acreage rarely arrives flat. Terracing, retaining and cut-and-fill get set out before the slab, while there is still machine access to the whole site.
Driveways
Long, and used by concrete trucks before they are used by you. Built to survive the build rather than resurfaced after it.

Built here

Completed Hawkesbury homes.

Rosedale House sits on 7,290 m² at Cattai with a pool and pool house. Ironwood House is a single-storey home on 2,004 m² at Pitt Town, with sandstone terracing and an elevated pool.

Elevated pool and sandstone terracing at an acreage home

Levels

On acreage, the ground is half the build.

Terracing, retaining and the pool shell all want machine access to the back of the block, which exists at the start of a build and not at the end. Sequencing them into the same program as the house is the difference between a garden that was designed and one that was fitted in.

Ironwood House at Pitt Town is the clearest example on this site: sandstone terracing holding an elevated pool against the fall, set out before the slab went down.

Pools and landscaping

Common questions

About building in the Hawkesbury.

Hawkesbury

My block is in a flood planning area. Can I still build?

Usually, but the flood planning level governs the design rather than the other way around — floor heights, materials below that level, and sometimes the footprint. It is the first thing to establish, because it changes what the house can be.

There is no sewer. What does that mean for the design?

An on-site wastewater system has to be designed and approved along with the house. It needs land, it needs to sit a set distance from boundaries and buildings, and it constrains where the house, the driveway and the pool can go.

Do you build on large acreage blocks?

Yes. Rosedale House at Cattai is 7,290 m² and Annangrove, over in the Hills, is two hectares. On this kind of block the services, the driveway and the levels are line items rather than details, and they are priced that way.

Credentials

Everything here is checkable.

Every line of the paperwork below can be verified without asking us.

Licence
NSW Builder Licence 274764C

Checkable on the NSW Fair Trading register in about a minute.

Insurance
Home Building Compensation Fund

Cover arranged through icare NSW, issued per job before work starts.

Memberships
Master Builders Association
Housing Industry Association

Both bodies publish searchable member directories.

Record
Building since 2011

More than eighty projects across Sydney. Eight of them are documented here.

Start a conversation

Send an address in the Hawkesbury.
We will tell you honestly what it can carry.

No obligation, no sales appointment, and no number invented before anyone has walked the block.